Pre-demolition preparations with respect to utility connections to structures.

Video detailed description:
Before beginning demolition, utility lines to the structure need to be cut. Therefore, call 811 Dig Alert to have relevant underground lines located. In this case, holes for two gas lines are prepared for the gas company to cap them, along with a hole to cap the water line at a location that does not interrupt water where we still want it to flow.